| Exports |
| Sl.No |
Subject |
Remarks |
New Rate |
| 1 |
Carting Charges |
|
|
|
| |
Unloading of export cargo from Truck to the Export Warehouse/Open yard using labour |
|
70 |
|
| |
and/or Fort-lift as per shipping bill declarations and on production of Customs noted |
|
|
|
| |
Shipping Bills |
|
|
|
| |
(Minimum Charge Rs.70-00 per Shipping Bill) |
|
|
|
| |
Additional Charges will be levied for Use of Crane. |
|
|
|
| |
|
|
|
|
| |
Shifting of cargo from one bay to another as required by the Shipper/Line |
|
70 |
|
| |
|
|
|
|
| |
An Administrative cost of Rs 150 per amendment will be charged |
|
|
|
| |
Measurement Charges @ Rs.2.50 per Carton will be levied for Measuring |
|
|
|
| |
& Issuing Certificate for LCL Cargo as required by the Shipper/Line. |
|
|
|
| |
|
|
|
|
| 2 |
H & T |
|
|
|
| |
Shifting of the nominated Container to stuffing point from within the CFS yard, |
|
|
|
| |
stuffing the cargo in the container, and transporting the loaded container to |
|
|
|
| |
JNPT/NSICT. |
|
|
|
| |
a) For Dry Van/Open Top (Within Gauge) |
|
3400 |
|
| |
b) For Out-of-Gauge (OOG) Cargo on |
|
6500 |
|
| |
Flat Rack/Open Top Containers |
|
|
|
| |
c) For Reefers : to be transported |
|
5400 |
|
| |
on a Genset mounted vehicle |
|
|
|
| |
(Addl charges will be levied for use of Crane) |
|
|
|
| |
d) Hazardous cargo |
|
|
|
| |
Extra Charges |
|
1000 |
|
| |
|
|
20' |
40' |
| |
UPTO 23 MT GROSS |
|
1000 |
0 |
| |
BETWEEN 23 AND 27 MT |
|
2000 |
1000 |
| |
MORE THAN 27 MT |
|
5000 |
4000 |
| |
|
|
|
|
| |
|
|
|
|
| 3 |
Reworking Charges |
|
|
|
| |
Providing labour and/or fork-lift for |
|
Single |
Full |
| |
destuffing or/and Stuffing, and shifting the |
|
2000 |
4000 |
| |
MT box MT yard (within GDL) |
|
|
|
| |
-For Dry Van/OT/Flat Rack |
|
|
|
| |
(Addl charges will be levied for use of Crane) |
|
|
|
| |
|
|
|
|
| 4 |
Cargo Storage Charges |
|
|
|
| |
|
|
|
|
| |
General Space (Including Open Yard Storage) |
|
55 |
|
| |
|
|
Per Sq.Mtr/Week |
|
| |
|
|
or part therof (Minimum |
|
| |
|
|
of 5 Sq.Mtrs per S/bill |
|
| |
|
|
will be charged). |
|
| |
Reserved Space |
|
175 |
|
| |
|
|
Per Sq.Mtr/Month |
|
| |
|
|
|
|
| |
Unit Space available for reservation |
|
100 |
|
| |
Payment terms |
|
Per Sq.Mtr/Week |
|
| |
(For Cancellation notice should be given 1 month in advance) |
|
|
|
| |
|
|
|
|
| Note :- |
Charges indicated under Line/Shippers A/C are recoverable from the party requesting the services. |
|
|
|
| |
|
|
|
|
| 5 |
Container Ground Rent Charges |
|
|
|
| |
|
|
|
|
| |
No. Of Days |
|
|
|
| |
Upto 7th day |
|
75 |
|
| |
8th to 15th day |
|
150 |
|
| |
16th to 30th day |
|
350 |
|
| |
31st day onwards |
|
600 |
|
| |
|
|
|
|
| |
Ground Rent charges on Reefer containers will be levied at 200% of the normal rate. |
|
|
|
| |
Ground Rent charges on ODC containers will be levied at 300% of the normal rate. |
|
|
|
| |
Ground Rent charges on HAZ Cargo containers will be levied at 200% of the normal rate. |
|
|
|
| |
|
|
|
|
| 6 |
Fuel Surcharge: |
|
|
|
| |
Export Fuel and
Energy Surcharge per Teu |
|
225/- per
teu |
|
| |
|
|
|
|
| (B) |
IMPORTS |
|
|
|
| |
|
|
|
|
| 1 |
Delivery Charges (FCL/LCL/Bonded) |
|
70 per MT |
|
| |
Loading of Cargo to Party's vehicle using Labour and/ |
|
|
|
| |
or Fork-Lift |
|
|
|
| |
(Minimum Rs.70-00 per item or per delivery) |
|
|
|
| |
(Addl charges will be levied for use of Crane) |
|
|
|
| |
|
|
|
|
| 2 |
H & T |
|
|
|
| |
Destuffed Delivery (Dock Destuffing) |
|
|
|
| |
Transportation of LDD Container from JNPT / NSICT to GDL, Destuffing the |
|
|
|
| |
cargo and Carrying the MT container to GDL MT yard. |
|
|
|
| |
|
|
|
|
| |
a) For Dry Van/Open Top (Within Gauge) |
|
3400 |
Per Teu |
| |
b) For Out-of-Gauge (OOG) Cargo on |
|
|
|
| |
Flat Rack/Open Top Containers |
|
6500 |
Per Teu |
| |
c) For Reefers : to be transported |
|
(Normal trailer) |
|
| |
on a Genset mounted vehicle |
|
5400 |
Per Teu |
| |
(Addl charges will be levied for use of Crane) |
|
|
|
| |
|
|
|
|
| |
d) Hazardous cargo |
|
|
|
| |
Extra Charges |
|
1000 |
|
| |
|
|
20' |
40' |
| |
UPTO 23 MT GROSS |
|
1000 |
0 |
| |
BETWEEN 23 AND 27 MT |
|
2000 |
1000 |
| |
MORE THAN 27 MT |
|
5000 |
4000 |
| |
|
|
|
|
| |
Loaded Delivery (Factory Destuffing) |
|
|
|
| |
Transportation of LDD Container from JNPT / NSICT to GDL, Grounding for |
|
|
|
| |
custom examination and Loading the Container on Party's Vehicle |
|
|
|
| |
|
|
|
|
| |
-For Dry Van / Open Top Containers |
|
2400 |
per teu |
| |
-For Dry Van Containers (With Waste-Paper) |
|
2300 |
per teu |
| |
-For Reefer Containers |
|
4500 |
per teu |
| |
(To be transported on a Gen-set Mounted Vehicle) |
|
|
|
| |
-For ODC/Flat Rack Containers |
|
5000 |
per teu |
| |
|
|
|
(normal trailer) |
| |
d) Hazardous cargo |
|
|
|
| |
Extra Charges |
|
1000 |
|
| |
|
|
20' |
40' |
| |
UPTO 23 MT GROSS |
|
1000 |
0 |
| |
BETWEEN 23 AND 27 MT |
|
2000 |
1000 |
| |
MORE THAN 27 MT |
|
5000 |
4000 |
| |
|
|
|
|
| |
|
|
|
|
| 3 |
Customs Examination / Reworking |
|
|
|
| |
Destuffing operation, if carried out as per the request of Consignees/Lines, |
|
|
|
| |
& Re-stuffing the cargo after Custom Examination. |
|
|
|
| |
-Less than or Equal to 25 % |
|
600 |
|
| |
-More than 25 % |
|
2100 |
|
| |
|
|
|
|
| 4 |
Cargo Storage Charges |
|
|
|
| |
Storage charges for Bonded Cargo |
|
80 |
|
| |
|
|
Per m2/week |
|
| |
|
|
(Minimum Charges will be |
|
| |
|
|
collected for 4 Weeks on |
|
| |
|
|
actual area occupied) |
|
| |
|
|
|
|
| |
Storage charges for LCL Cargo |
first two weeks |
75 |
|
| |
|
next two weeks |
90 |
|
| |
|
fifth week onwards |
150 |
|
| |
|
|
Per m2/week |
|
| |
|
|
(Minimum of 5 M2 per |
|
| |
|
|
item will be charged) |
|
| |
|
|
|
|
| |
Storage charges for LCL - ODC Cargo |
first two weeks |
150 |
|
| |
|
next two weeks |
175 |
|
| |
|
fifth week onwards |
300 |
|
| |
|
|
Per m2/week |
|
| |
|
|
(Minimum of 5 M2 per |
|
| |
|
|
item will be charged) |
|
| |
|
|
|
|
| 5 |
Container Ground Rent Charges |
|
|
|
| |
|
|
|
|
| |
No of Days |
|
|
|
| |
1 to 3 days |
|
150 per teu/per day |
|
| |
4 to 7 days |
|
200 per teu/per day |
|
| |
8 to 11 days |
|
300per teu/per day |
|
| |
12 to 15 days |
|
400per teu/per day |
|
| |
16 to 30 days |
|
600 per teu/per day |
|
| |
31 days or more |
|
800 per teu/per day |
|
| |
|
|
|
|
| |
Ground Rent charges on Reefer containers will be levied at 200% of the normal rate |
|
|
|
| |
Ground Rent charges on ODC containers will be levied at 300% of the normal rate. |
|
|
|
| |
Ground Rent charges on HAZ Cargo containers will be levied at 200% of the normal rate. |
|
|
|
| |
|
|
|
|
| 6 |
Survey Charges: |
|
|
|
| |
Survey Charges per container |
|
100/- |
|
| |
|
|
|
|
| 7 |
Fuel Surcharge: |
|
|
|
| |
Fuel and Energy
surcharge per Teu |
|
225/- per teu |
|
| |
|
|
|
|
| C |
EMPTY & OTHER GENERAL OPERATIONS |
|
|
|
| |
|
|
|
|
| 1 |
Transportation (Excl Lo/Lo) |
|
|
|
| |
Movement of Containers from GDL to JNPT/NSICT/ |
|
|
|
| |
CWC/Maersk and other CFSs at Dronagiri & Vise versa |
|
|
|
| |
For Empty Containers |
|
1200 |
|
| |
For Loaded Containers |
|
2250 |
|
| |
|
|
|
|
| 2 |
Lift-Off / Lift-On |
|
|
|
| |
Lift-Off / Lift-On in GDL Complex |
|
|
|
| |
For Empty Containers |
|
125 |
|
| |
For Loaded Containers |
|
250 |
|
| |
|
|
|
|
| 3 |
Internal Shifting |
|
|
|
| |
Shifting from One location to another within GDL |
|
|
|
| |
For Empty Containers |
|
300 |
|
| |
For Loaded Containers |
|
500 |
|
| |
|
|
|
|
| 4 |
Sweeping Charges |
|
40 |
|
| |
|
|
|
|
| 5 |
Shifting the MT container for Washing |
|
|
|
| |
Shifting the MT container to Washing yard, |
|
300 |
|
| |
Washing the container and stacking back |
|
|
|
| |
the container at Empty yard |
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| 6 |
Reefer Plugging / Monitoring / PTI |
|
|
|
| |
Reefer Plugging Charges |
|
1850 |
|
| |
|
|
per day or part/container |
|
| |
Reefer Monitoring Charges |
|
275 |
|
| |
|
|
Per shift on Week days |
|
| |
|
|
300 |
|
| |
|
|
Per shift on Sundays/Holidays |
|
| |
|
|
For a max of 5 Containers per Line. |
|
| |
|
|
|
|
| |
(Rates applicable for both Import & Export Loaded Containers) |
|
|
|
| |
|
|
|
|
| |
PTI Charges for Reefer Containers |
|
Running |
Full |
| |
20' |
|
600 |
1000 |
| |
40' |
|
700 |
1100 |
| |
|
|
|
|
| |
|
|
|
|
| 7 |
Survey Charges |
|
|
|
| |
CLP Charges for Container stuffed at CFS |
|
45 |
|
| |
|
|
(per teu) |
|
| |
EIR Gate-In |
|
45 |
|
| |
|
|
(per teu) |
|
| |
|
|
|
|
| |
EIR Gate-Out |
|
45 |
|
| |
|
|
(per teu) |
|
| |
Pre-Repair Damage Survey |
|
45 |
|
| |
|
|
(per container) |
|
| |
Post-Repair Damage Survey |
|
45 |
|
| |
|
|
(per container) |
|
| |
|
|
|
|
| 8 |
Locking Charges |
|
50 |
|
| |
|
|
(Per Day /Container) |
|
| 9 |
Crane Charges |
|
4100 |
|
| |
Capacity 10 MT |
|
(per half shift) |
|
| |
|
|
2200 |
|
| |
|
|
(for half shift) |
|
| |
|
|
|
|
| 10 |
Empty Ground Rent Charges |
|
|
|
| |
No of Days |
|
|
|
| |
Upto 7th day |
|
10 |
|
| |
8-10 days |
|
75 |
|
| |
11-15 days |
|
150 |
|
| |
16th day onwards |
|
250 |
|
| |
|
|
|
|
| |
(Date in and Date out/Stuffing date,both will be taken into account |
|
|
|
| |
for calculating Empty Ground Rent charges). |
|
|
|
| |
Ground Rent charges on ODC containers will be levied at 300% of the normal rate. |
|
|
|
| |
|
|
|
|
| 11 |
Weighment Charges |
|
100 |
|
| |
|
|
(per Teu) |
|
| |
(In addition Internal shifting charges will be applicable if GDL vehicle used) |
|
|
|
| |
|
|
|
|
| 12 |
Bond Insurance Charges |
|
0.25 |
|
| |
|
|
per 1000 of (assessed vaue+ duty) |
|
| E |
ESTATE RELATED CHARGES |
|
|
|
| |
Rent |
|
|
|
| 1 |
AC Office- Area 120 F2 |
|
11000 |
|
| |
|
|
per month |
|
| 2 |
Non-AC Office- Area 120 F2 |
|
8300 |
|
| |
(Rent payable quarterly in advance) |
|
per month |
|
| |
Security Deposit |
|
|
|
| |
|
|
|
|
| 1 |
AC Office- Area 120 F2 |
|
33000 |
|
| |
|
|
|
|
| 2 |
Non-AC Office - Area 120 F2 |
|
24900 |
|
| |
(Security deposit does not bear any interest) |
|
|
|
| |
|
|
|
|
| 3 |
Locker |
|
250 |
|
| |
|
|
(Per Yr) |
|
| |
|
|
|
|
| FOR THE PURPOSE OF THIS TARIFF CONTAINERS MORE THAN 40' WILL BE CHARGED @ 2.5 TIMES THE PER TEU RATE |
|
| SERVICE TAX WHEREVER APPLICABLE WILL BE CHARGED |
|
|
| *FOR SAFETY REASONS IF ODC CARGO IS TO BE MOVED ON LOWBED TRAILORS, MOVEMENT CHARGES WILL |
|
| BE QUOTED ON CASE TO CASE BASIS |
|
|