| Exports |
| Sl.No |
Subject |
Remarks |
New Rate |
|
1 |
Carting
Charges |
|
|
|
| |
Unloading of
export cargo from Truck to the Export Warehouse/Open
yard using labour |
|
70/- per mt |
|
| |
and/or Fork-lift as per shipping bill declarations and on production of Customs noted |
|
|
|
| |
Shipping Bills |
|
|
|
| |
(Minimum Charge Rs.70-00 per
Shipping Bill) |
|
|
|
| |
Additional Charges will be levied
for Use of Crane. |
|
|
|
| |
|
|
|
|
| |
Shifting of cargo from one bay to
another as required by the Shipper/Line |
|
70/- per mt |
|
| |
|
|
|
|
| |
An Administrative cost of Rs 150
per amendment will be charged |
|
|
|
| |
Measurement Charges @ Rs.2.50 per
Carton will be levied for Measuring |
|
|
|
| |
& Issuing Certificate for LCL
Cargo as required by the Shipper/Line. |
|
|
|
| |
|
|
|
|
|
2 |
H & T |
|
20' |
40' |
| |
Shifting of the nominated
Container to stuffing point from within the CFS
yard, |
|
|
|
| |
stuffing the cargo in the
container, and transporting the loaded container to |
|
|
|
| |
JNPCT/GTI/NSICT. |
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
a) For Dry Van/Open Top (Within
Gauge) (< 23 MTS) |
|
4400 |
6800 |
| |
a.1) For Dry Van/Open Top (Within
Gauge) (>= 23 MTS to < 27 MTS) |
|
5400 |
7800 |
| |
a.2) For Dry Van/Open Top (Within
Gauge) (>= 27 MTS) |
|
8400 |
10800 |
| |
|
|
|
|
| |
b) For Out-of-Gauge (OOG) Cargo
on Flat Rack/Open Top Containers-(<23 MTS) |
|
7500 |
13000 |
| |
b.1) For Out-of-Gauge (OOG) Cargo
on Flat Rack/Open Top Containers- (>=23MTs to <
27MTS) |
|
8500 |
14000 |
| |
b.2) For Out-of-Gauge (OOG) Cargo
on Flat Rack/Open Top Containers- (> = 27MTS) |
|
11500 |
17000 |
| |
|
|
|
|
| |
c) For Reefers : to be
transported on a Genset mounted vehicle -(<23 MTS) |
|
6400 |
10800 |
| |
c.1) For Reefers : to
be transported on a Genset mounted vehicle (>=23MTS to
<27 MTS) |
|
7400 |
11800 |
| |
c.2) For Reefers : to
be transported on a Genset mounted vehicle (>= 27 MTS) |
|
10400 |
14800 |
| |
(Addl charges will be
levied for use of Crane) |
|
|
|
| |
|
|
|
|
| |
d) Hazardous cargo |
|
|
|
| |
Extra Charges |
|
1000/- |
Per Teu |
| |
|
|
|
|
| 3 |
Reworking Charges |
|
|
|
| |
Providing labour and/or fork-lift for |
|
Single |
Full |
| |
destuffing or/and Stuffing, and shifting the |
|
3000/- |
6000/- |
| |
MT box MT yard (within GDL) |
|
|
|
| |
'-For Dry Van/OT/Flat Rack |
|
|
|
| |
(Addl charges will be levied for use of Crane) |
|
|
|
| |
|
|
|
|
| 4 |
Cargo Storage Charges |
|
|
|
| |
|
|
|
|
| |
General Space (Including Open
Yard Storage) |
|
55/- per Sq.Mtr/Week or part thereof
(Minimum of 5 Sq.Mtrs per
S.Bill will be charged). |
| |
|
|
|
|
| |
Reserved Space |
|
175/- |
|
| |
|
|
Per Sq.Mtr/Month |
|
| |
|
|
|
|
| |
Minimum Unit Space available for
reservation |
|
100sq.mtr |
|
| |
Payment terms |
|
|
|
| |
(For Cancellation notice should
be given 1 month in advance) |
|
|
|
| |
|
|
|
|
|
5 |
Container
Ground Rent Charges |
|
|
|
| |
|
|
|
|
| |
No. Of Days |
|
|
|
| |
Upto 7th day |
|
75/- |
Per Teu |
| |
8th to 15th day |
|
150/- |
Per Teu |
| |
16th to 30th day |
|
350/- |
Per Teu |
| |
31st day onwards |
|
600/- |
Per Teu |
| |
|
|
|
|
| |
Ground Rent charges on Reefer and
HAZ Cargo -containers will be levied at 200% of the
normal rate. |
|
|
|
| |
Ground Rent for ODC containers
will be levied 300% of the normal rate for days ( <
=7) |
|
|
|
| |
Ground Rent for ODC containers
will be levied 350% of the normal rate for days (>=
8 to <15) |
|
|
|
| |
Ground Rent for
ODC containers will be levied 400% of the normal
rate for days (>=15) |
|
|
|
| |
|
|
|
|
| 6 |
Fuel and Energy
Surcharge: |
|
|
|
| |
Fuel Surcharge |
|
150/- per teu |
|
| |
Energy Surcharge |
|
125/- per teu |
|
| |
|
|
|
|
|
(B) |
IMPORTS |
|
|
|
| |
|
|
|
|
|
1 |
Delivery
Charges (FCL/LCL/Bonded) |
|
75/- per MT |
|
| |
Loading of
Cargo to Party's vehicle using Labour and/or Fork-Lift |
|
|
|
| |
(Minimum
Rs.75-00 per item or per delivery) |
|
|
|
| |
(Addl charges
will be levied for use of Crane) |
|
|
|
| |
|
|
|
|
|
2 |
H & T |
|
|
|
| |
Destuffed
Delivery (Dock Destuffing) |
|
|
|
| |
Transportation of LDD Container
from JNPCT /GTI/ NSICT to GDL, Destuffing the |
|
|
|
| |
cargo and Carrying the MT
container to GDL MT yard. |
|
|
|
| |
|
|
Teu |
Feu |
| |
a) For Dry Van/Open Top (Within Gauge) (<23MTS) |
|
4400 |
6800 |
| |
a.1) For Dry Van/Open Top (Within
Gauge)-(>=23MTS to <27MTS) |
|
5400 |
7800 |
| |
a.2) For Dry Van/Open Top (Within
Gauge)- (>=27MTS) |
|
8400 |
10800 |
| |
|
|
|
|
| |
b) For Out-of-Gauge (OOG) Cargo on Flat
Rack/Open Top Containers- (<23MTS) |
|
7500 |
13000 |
| |
b.1) For Out-of-Gauge (OOG) Cargo on Flat
Rack/Open Top Containers-(>=23MTS to <27MTS) |
|
8500 |
14000 |
| |
b.2) For Out-of-Gauge (OOG) Cargo on Flat
Rack/Open Top Containers- (>=27MTS) |
|
11500 |
17000 |
| |
|
|
|
|
| |
c) For Reefers : to be transported on a Genset
mounted vehicle (<23MTS) |
|
6400 |
10800 |
| |
c.1) For Reefers : to be transported on a Genset
mounted vehicle (>=23MTs to <27MTS) |
|
7400 |
11800 |
| |
c.2) For Reefers : to be transported on a Genset
mounted vehicle (>=27MTS) |
|
10400 |
14800 |
| |
(Addl charges will be levied for use of
Crane) |
|
|
|
| |
|
|
|
|
| |
d) Hazardous cargo |
|
|
|
| |
Extra Charges |
|
1200/- |
per teu |
| |
|
|
|
|
| |
e) Hazardous charges on LCL Cargo |
|
|
|
| |
Extra Charges |
|
500/- |
Per Bill of Entry |
| |
|
|
|
|
| |
Loaded Delivery (Factory
Destuffing) |
|
|
|
| |
Transportation of LDD Container from JNPCT /GTI/
NSICT to GDL, Grounding for |
|
|
|
| |
custom examination and Loading the Container on
Party's Vehicle |
|
|
|
| |
|
|
Teu |
Feu |
| |
-For Dry Van / Open Top Containers (<23MTS) |
|
3400 |
4800 |
| |
a.1) For Dry Van/Open Top (Within Gauge)-(>=23MTS
to <27MTS) |
|
4400 |
5800 |
| |
a.2) For Dry Van/Open Top (Within Gauge)-
(>=27MTS) |
|
7400 |
8800 |
| |
|
|
|
|
| |
-For Dry Van Containers (With Waste-Paper) (<
23MTS) |
|
3300 |
4600 |
| |
b.1)'-For Dry Van Containers (With Waste-Paper)
(>=23MTS to < 27MTS) |
|
4300 |
5600 |
| |
b.2)'-For Dry Van Containers (With Waste-Paper)
(>=27MTS) |
|
7300 |
8600 |
| |
|
|
|
|
| |
c) For Out-of-Gauge (OOG) Cargo on Flat Rack/Open
Top Containers-(< 23MTS) |
|
6000 |
10000 |
| |
b.1) For Out-of-Gauge (OOG) Cargo on Flat
Rack/Open Top Containers-(>=23MTS to < 27MTS) |
|
7000 |
11000 |
| |
b.2) For Out-of-Gauge (OOG) Cargo on Flat
Rack/Open Top Containers-(>=27MTS) |
|
10000 |
14000 |
| |
|
|
|
|
| |
c) For Reefers : to be transported on a Genset
mounted vehicle (<23MTS) |
|
5500 |
9000 |
| |
c.1) For Reefers : to be transported on a Genset
mounted vehicle (>=23MTS to 27MTS) |
|
6500 |
10000 |
| |
c.2) For Reefers : to be transported on a Genset
mounted vehicle (>=27MTS) |
|
9500 |
13000 |
| |
(To be transported on a Gen-set Mounted Vehicle) |
|
|
|
| |
|
|
|
|
| |
d) Hazardous cargo |
|
|
|
| |
Extra Charges |
|
1200/- |
per teu |
| |
|
|
|
|
| 3 |
Customs Examination /
Reworking |
|
|
|
| |
Destuffing operation, if carried
out as per the request of Consignees/Lines, |
|
|
|
| |
& Re-stuffing the cargo after
Custom Examination. |
|
|
|
| |
-Less than or Equal to 25 % |
|
600/- |
per teu |
| |
-More
than 25 % |
|
2100/- |
per teu |
| |
|
|
|
|
|
4 |
Cargo
Storage Charges |
|
Per
m2/week |
|
| |
|
|
|
|
| |
Storage charges for LCL Cargo |
first two weeks |
80/- |
|
| |
|
next two weeks |
100/- |
|
| |
|
fifth week onwards |
150/- |
|
| |
|
|
(Minimum of 5 M2 per
item will be charged) |
|
| |
|
|
|
|
| |
Storage charges for LCL - ODC
Cargo |
first two weeks |
150/- |
|
| |
|
next two weeks |
175/- |
|
| |
|
fifth week onwards |
300/- |
|
| |
|
|
(Minimum of 5 M2 per
item will be charged) |
|
| |
|
|
|
|
|
5 |
Container
Ground Rent Charges |
|
|
|
| |
|
|
|
|
| |
No of Days |
|
|
|
| |
First 3 days |
|
150 per teu/per day |
|
| |
4 to 7 days |
|
200 per teu/per day |
|
| |
8 to 11 days |
|
300 per teu/per day |
|
| |
12 to 15 days |
|
400 per teu/per day |
|
| |
16 to 30 days |
|
600 per teu/per day |
|
| |
31 days or more |
|
800 per teu/per day |
|
| |
|
|
|
|
| |
Ground Rent charges on Reefer and
HAZ Cargo -containers will be levied at 200% of the
normal rate. |
|
|
|
| |
Ground Rent for ODC containers
will be levied 300% of the normal rate for days ( <
= 7) |
|
|
|
| |
Ground Rent for ODC containers
will be levied 350% of the normal rate for days >= 8
to <15 |
|
|
|
| |
Ground Rent for ODC containers
will be levied 400% of the normal rate for days >=15 |
|
|
|
| |
|
|
|
|
|
6 |
Survey Charges: |
|
|
|
| |
Survey Charges per
container |
|
125/- |
Per box |
| |
|
|
|
|
|
7 |
Fuel and Energy Surcharge: |
|
|
|
| |
Fuel
Surcharge |
|
150/- per teu |
|
| |
Energy surcharge per
Teu |
|
125/- per teu |
|
| |
|
|
|
|
| 8 |
Monitoring and Security Charges: |
|
|
|
| |
Monitoring, Shifting and stacking of High Valued cargo containers |
|
1000/- |
Per Teu |
| |
|
|
|
|
|
C |
EMPTY &
OTHER GENERAL OPERATIONS |
|
|
|
| |
|
|
|
|
|
1 |
Transportation (Excl Lo/Lo) |
|
|
|
| |
Movement of Containers from GDL to JNPT/NSICT/ |
|
|
|
| |
CWC/Maersk and other CFSs at Dronagiri & Vise
versa |
|
|
|
| |
For Empty Containers |
|
1200/- |
per teu |
| |
For Loaded Containers |
|
2250/- |
per teu |
| |
|
|
|
|
| 2 |
Lift-Off / Lift-On |
|
|
|
| |
Lift-Off / Lift-On in GDL Complex |
|
|
|
| |
For Empty Containers |
|
150/- |
per teu |
| |
For Loaded Containers |
|
275/- |
per teu |
| |
|
|
|
|
| 3 |
Internal Shifting |
|
|
|
| |
Shifting from One location to another within GDL |
|
|
|
| |
For Empty Containers |
|
300/- |
per teu |
| |
For Loaded Containers |
|
500/- |
per teu |
| |
|
|
|
|
| 4 |
Sweeping Charges |
|
40/- |
per teu |
| |
|
|
|
|
| 5 |
Shifting the MT container
for Washing |
|
|
|
| |
Shifting the MT container to Washing yard, |
|
300/- |
per teu |
| |
Washing the container and stacking back |
|
|
|
| |
the container at Empty yard |
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| 6 |
Reefer Plugging / Monitoring
/ PTI |
|
|
|
| |
Reefer Plugging Charges |
|
2050/- |
|
| |
|
|
per day or part/container |
|
| |
|
|
|
|
| |
Reefer Monitoring Charges |
|
275/- |
|
| |
|
|
per shift on Week days |
|
| |
|
|
300/- |
|
| |
|
|
per shift on Sundays/Holidays |
|
| |
|
|
(For a max of 5 Containers per Line.) |
|
| |
|
|
|
|
| |
(Rates applicable for both Import & Export Loaded
Containers) |
|
|
|
| |
|
|
|
|
| |
PTI Charges for Reefer Containers |
|
Running |
Full |
| |
20' |
|
600/- |
1000/- |
| |
40' |
|
700/- |
1100/- |
| |
|
|
|
|
| |
|
|
|
|
| 7 |
Survey Charges |
|
|
|
| |
CLP Charges for Container stuffed at CFS |
|
55/- |
per teu |
| |
|
|
|
|
| |
EIR Gate-In |
|
55/- |
per teu |
| |
|
|
|
|
| |
|
|
|
|
| |
EIR Gate-Out |
|
55/- |
per teu |
| |
|
|
|
|
| |
Pre-Repair Damage Survey |
|
45/- |
per container |
| |
|
|
|
|
| |
Post-Repair Damage Survey |
|
45/- |
per container |
| |
|
|
|
|
| |
|
|
|
|
| 8 |
Locking Charges |
|
50/- |
per day/teu |
| |
|
|
|
|
| 9 |
Crane Charges |
|
|
|
| |
Capacity 10 MT |
|
4500/- |
(per full shft) |
| |
|
|
2500/- |
(for half shift) |
| |
|
|
|
|
| |
Note: (Deployment of different crane
capacities will be subject to cargo nature, weight and
operational issues) |
|
|
|
| |
|
|
|
|
| 10 |
Empty Ground Rent Charges |
|
|
|
| |
No of Days |
|
|
|
| |
Upto 7th day |
|
10/- |
per
teu |
| |
8-10 days |
|
75/- |
per
teu |
| |
11-15 days |
|
150/- |
per
teu |
| |
16th day onwards |
|
250/- |
per
teu |
| |
(Date in and Date out/Stuffing
date,both will be taken into account |
|
|
|
| |
for calculating Empty Ground Rent
charges) |
|
|
|
| |
Ground Rent for ODC containers
will be levied 300% of the normal rate. |
|
|
|
| |
|
|
|
|
|
11 |
Weighment
Charges |
|
750/- |
per teu |
| |
(Including shifting of container from stack to weighbridge and back) |
|
|
|
| |
|
|
|
|
|
12 |
Bond
Insurance Charges |
|
0.25 |
|
| |
|
|
per 1000 of (assessed
value+ duty) |
|
| |
|
|
|
|
| |
Bond Cargo Storage Charges |
|
|
|
| |
Storage charges |
|
80/- |
|
| |
|
|
Per m2/week |
|
| |
|
|
(Minimum Charges will
be collected for |
|
| |
|
|
4 weeks on actual area
occupied) |
|
| |
|
|
|
|
| |
20% additional charges on
Hazardous Cargo on the entire amount |
|
|
|
| |
|
|
|
|
|
13 |
Fumigation
Charges |
|
20' |
40' |
| |
|
|
|
|
| |
Fumigation of
container to all ports except Australia (Without wood
packing) with MBR |
|
850 |
1800 |
| |
Fumigation of
container to all ports except Australia (With wood
packing) with MBR |
|
1200 |
2000 |
| |
Fumigation of
container to Australian Ports (With/Without wood
packing ) with MBR |
|
2200 |
4500 |
| |
Fumigation of
container to Australian ports(With Wood packing) with
MBR |
|
2000 |
4000 |
| |
Fumigation of
container to all ports except Australia with Aluminium
Phosphide |
|
300 |
650 |
| |
Fumigation of
container to Australian Ports with Aluminium Phosphide |
|
400 |
850 |
| |
Pallet fumigation
with MBR |
|
1100 |
2050 |
| |
|
|
|
|
|
14 |
Scanning Charges |
|
|
|
| |
(In case containers
are selected by customs for scanning) |
|
|
|
| |
|
|
|
|
| |
For FCL containers: |
|
Rs.500 |
per Teu |
| |
For LCL containers: |
|
Rs.250 |
Per Bill of Entry |
| |
|
|
|
|
| E |
BUFFER |
|
|
|
| |
|
|
|
|
| |
H&T |
|
20' |
40' |
| |
|
|
|
|
| |
-For Dry Van / Open Top
Containers |
|
2500 |
3000 |
| |
a.1) For Dry Van/Open Top (Within
Gauge)-Between 23 and 27 MT |
|
3500 |
4000 |
| |
a.2) For Dry Van/Open Top (Within
Gauge)-More than 27MT |
|
6500 |
7000 |
| |
|
|
|
|
| |
Ground Rent charges |
|
|
|
| |
No of Days |
|
|
|
| |
Upto 7th day |
|
75/- |
Per Teu |
| |
8-10 days |
|
150/- |
Per Teu |
| |
11-15 days |
|
350/- |
Per Teu |
| |
16th day onwards |
|
500/- |
Per Teu |
| |
|
|
|
|
| |
Customs Examination /
Reworking |
|
|
|
| |
Destuffing operation, if carried
out as per the request of Consignees/Lines, |
|
|
|
| |
& Re-stuffing the cargo after
Custom Examination. |
|
|
|
| |
'-Less than or Equal to 25 % |
|
600/- per Teu |
|
| |
'-More than 25 % |
|
2100/- Per Teu |
|
| |
|
|
|
|
| F |
ESTATE RELATED CHARGES |
|
|
|
| |
Rent |
|
|
|
| 1 |
AC Office - Area 120
F2 |
|
11000/- per month |
|
| |
|
|
|
|
| 2 |
Non-AC Office - Area
120 F2 |
|
8300/- per month |
|
| |
(Rent payable quarterly in
advance) |
|
|
|
| |
|
|
|
|
| |
Security Deposit |
|
|
|
| 1 |
AC Office - Area 120
F2 |
|
33000/- |
|
| |
|
|
|
|
| 2 |
Non-AC Office - Area
120 F2 |
|
24900/- |
|
| |
(Security deposit does not bear
any interest) |
|
|
|
| |
|
|
|
|
| 3 |
Locker |
|
75/- per
locker / per month |
|
| |
|
|
|
|
|
FOR THE PURPOSE OF THIS TARIFF
CONTAINERS MORE THAN 40' WILL BE CHARGED @ 2.5 TIMES
THE PER TEU RATE |
|
|
SERVICE TAX WHEREVER APPLICABLE WILL BE CHARGED |
|
|
*FOR SAFETY REASONS IF ODC CARGO IS TO BE MOVED
ON LOWBED TRAILORS, MOVEMENT CHARGES WILL BE QUOTED
ON CASE TO CASE BASIS |
|